Off-Balance Sheet OpEx Peak-Load Shaving Strategy UL 9540A Safety Certified

Reduce Your Business Operating Costs by up to 60%

Heavy-duty modular solar & storage, engineered for commercial loads — with zero-upfront financing options.

Request a Commercial Energy Audit

See Your Projected Savings

Your Projected 5-Year Savings
₦0 Million
vs. continuing on diesel + grid tokens at today's prices
Proceed to Book ME-SAF-01 site audit →
Procurement

Choose how you acquire your system

Option A Best Fit For You

Outright Purchase

Enterprise EaaS Terms
  • 100% upfront capital
  • Maximum lifetime savings
  • Assets capitalized on day one
Option B Best Fit For You

Rent-to-Own Lease

Enterprise EaaS Terms
  • 10%–20% security deposit
  • Flat monthly installments, 24–36 months
  • Zero annual inflation adjustments
  • Automatic title transfer
Option C Best Fit For You

Zero-Upfront PPA

Enterprise EaaS Terms
  • ₦0 upfront cost, fully financed by Mango Energy
  • Pay only for solar energy consumed
  • Locked-in base rate of ₦180/kWh, 3% escalation cap

Recommendation updates live as you move the sliders in the calculator above, based on your monthly generator fuel + grid token spend.

System Brackets

Heavy-duty modular energy systems

10–20kVA

SME Office Pack

Hardware Architecture10–20kVA Modular Inverter + Lithium BESS

Corporate offices, regional clinics, retail branches. Replaces active generator fuel costs during 8am–6pm working hours.

Enterprise EaaS Terms
  • UL 9540A fire-safety tested cells
20–50kVA

Commercial Facility Microgrid

Hardware Architecture20–50kVA BESS, UL 9540A Certified

Boutique hotels, private academies, warehouse hubs. Protects sensitive IT hardware from voltage fluctuations while shaving peak-demand charges.

Enterprise EaaS Terms
  • Off-balance-sheet OpEx structuring
  • Peak-load shaving strategy included
100kVA+ · Utility Grade

Heavy Industrial Multi-MWh System

Hardware Architecture200–500kW+ BESS, Multi-MWh Capacity, UL 9540A Certified

Factories, multi-building estates, central hospitals. Fully replaces baseline diesel expenses with utility-grade, grid-interactive storage.

Enterprise EaaS Terms
  • Dedicated facility engineer of record
  • Cell-level telemetry & automated peak-shaving control
✓
Technical Safety Disclosure Every BESS deployment is UL 9540A tested for thermal runaway fire propagation, with dedicated bypass circuits and inverter ventilation clearances to ME-SAF-01.
UL 9540A Certified
Rent vs. Own

Why Enterprises Avoid Hardware Ownership

✓

Keeps CapEx off the balance sheet

Zero-upfront PPA and lease structures book as OpEx, protecting capital for core operations.

✓

De-risks technology ownership

BESS chemistry and safety standards evolve fast — leasing keeps your facility on current, certified hardware.

✓

SLA-backed uptime

4-hour regional field engineer dispatch and cell-level telemetry monitoring are built into every plan, not billed as extras.

✓

Predictable, escalation-capped cost

A locked base rate with a 3% escalation cap replaces volatile diesel and grid-token spend with one forecastable line item.

Deployment

Enterprise Microgrid Deployment in 4 Steps

Load Profile Audit

Our engineers assess your facility's peak, average and critical-load profile on site.

Custom Sizing

You receive a bracketed system recommendation — SME, Commercial or Industrial — with a procurement option.

Zero-CapEx Deploy

Certified installers commission your microgrid under ME-SAF-01, with earth-pit and bypass-circuit sign-off.

Automated Telemetry

Cell-level monitoring and peak-shaving automation go live, feeding your Facility Director dashboard.

ME-SAF-01 Safety & Rigor

  • Tested earth pits, strictly under 5 Ohms
  • Dedicated heavy-load bypass circuits
  • 300mm inverter ventilation clearances

SLA Commitments

  • Cell-level telemetry monitoring
  • 4-hour regional field engineer dispatch for critical alerts
  • Certified Mango installer network nationwide
Form ME-SAF-01

Request a Commercial Energy Audit

Tell us about your site and current generator load — a specialist responds with a transparent quote, usually within one business day.

We'll only use these details to reach you about your quote — no spam, ever.